Analisis Teknik Serta Kelayakan Ekonomi Pada Perancangan Pembangkit Listrik Tenaga Surya Sistem Hybrid

Denis Denis, Jaka Windarta, Bambang Winardi, Imam Arifan Nurdani

Abstract


National electrical energy needs are increasing every year. This is accompanied by an increasingly massive use of fossil energy as a power plant. The government is targeting a share of new and renewable energy (EBT) of at least 23% by 2025. As a tropical country, Indonesia has a large potential for new and renewable energy, which mostly consists of solar energy with an average daily radiation of 4.8 kWh/m2/day. The design of a solar power plant (PLTS) at SMA Negeri 3 Surakarta is an effort to utilize NRE and can be used as a model for environmentally friendly schools for similar public institutions and the general public. This PLTS uses a hybrid system with a generating capacity of 1230 Wp, SCC 60A, 24 V 200 Ah battery and a 2400 W hybrid inverter. Using analysis methods with PVSyst and RetScreen simulations, this PLTS generates electricity of 1,653.2 kWh/year. With an initial investment of IDR 25,186,000, the net present value is IDR 1,210,272 and the payback period is 24 years.


Keywords


renewable energy; solar power plant; hybrid; ret screen.

Full Text:

PDF

References


D.E.N,OutlookEnergiIndonesia(OEI)2019.2019.[2]J.Jamaludin,“OPTIMASIALIRANKOMPRESSORPADATURBINGASUNTUKPEMBANGKITLISTRIKTENAGABIOMASSDENGANKAPASITAS20MW,”JurnalTeknik,vol.5,no.2,2016,doi:10.31000/jt.v5i2.343.[3]KementrianEnergidanSumberDayaMineral,RENCANAUMUMKETENAGALISTRIKANNASIONAL2019-2038.Jakarta,2019.[4]KementrianPerindustrianRepublikIndonesia,“BookletSeminarNasionalTeknologiIndustriHijau,”vol.2,no.Peranteknologiramahlingkunganuntukmendukungindustrihijau,May2017.[5]A.K.alBaharandA.T.Maulana,“PerencanaandanSimulasiSistemPLTSOff-GridUntukPeneranganGedungFakultasTeknikUNKRIS,”JurnalIlmiahElektrokrisna,vol.6,no.3,2018.[6]K.A.Makinde,O.B.Adewuyi,A.O.Amole,andO.A.Adeaga,“DesignofGrid-connectedandStand-alonePhotovoltaicSystemsforResidentialEnergyUsage:ATechnicalAnalysis,”JournalofEnergyResearchandReviews,2021,doi:10.9734/jenrr/2021/v8i130203.[7]J.Windarta,S.Saptadi,Denis,D.A.Satrio,andJ.S.Silaen,“EconomicFeasibilityAnalysisofRooftopSolarPowerPlantDesignwithHousehold-ScaleOn-GridSysteminSemarangCity,”inE3SWebofConferences,2020,vol.202.doi:10.1051/e3sconf/202020209002.[8]PujawanI.N.,EkonomiTeknikEdisi3,3rded.Yogyakarta:LautanPustaka,2019.[9]M.Giatman,EKONOMITEKNIK.Jakarta:RajaGrafindoPersada,2011.[10]T.AfazandM.Gusman,“AnalisisKelayakanInvestasiMenggunakanMetodeDiscountedCashFlowpadaTambangAspalPT.WijayaKaryaBitumendiDesaNamboKecematanLasalimu,KabupatenButon,SulawesiTenggara,”JurnalBinaTambang,vol.6,no.6,2021.[11]M.IR.MandiyoPriyo,“EkonomiTeknik,”JournalofMaterialsProcessingTechnology,vol.1,no.1,2018.[12]B.Marionetal.,“Performanceparametersforgrid-connectedPVsystems,”2005.doi:10.1109/PVSC.2005.1488451.[13]A.K.Saxena,S.Saxena,andK.Sudhakar,“Energy,economicandenvironmentalperformanceassessmentofagrid-tiedrooftopsystemindifferentcitiesofIndiabasedon3Eanalysis,”CleanEnergy,vol.5,no.2,2021,doi:10.1093/ce/zkab008.[14]S.Sugianto,“ComparativeAnalysisofSolarCellEfficiencybetweenMonocrystallineandPolycrystalline,”INTEK:JurnalPenelitian,vol.7,no.2,2020,doi:10.31963/intek.v7i2.2625.[15]BankIndonesia,“DataInflasi-BankSentralRepublikIndonesia,”DataInflasi-BankSentralRepublikIndonesia,2021.[16]J.Windarta,E.W.Sinuraya,Denis,D.Mahardhika,andI.Muammar,“StudiPerancanganPembangkitListrikTenagaSurya(PLTS)denganSistemOnGriduntukSupplyListrikpadaLingkunganBankPerkreditanRakyatPedesaandiBPRBKKMandirajaCabangWanayasaKabupatenBanjarnegaraditinjaudariTeknisdanEkonomiTeknik,”Dec.2020.[17]Denis,E.W.Sinuraya,dkk,"AnalysisofPerformanceandControlofDCMicrogridsasElectricityProvidersforRenewableEnergy",The6thInternationalConferenceonEnergy,Environment,Epidemiology,andInformationSystem(ICENIS2021),Semarang,2021,doi:10.1051/e3sconf/202131704032[18]B.Winardi,E.W.Sinuraya,A.Nughrogo,Denis,"DesignandImplementationofRooftopoffGridSolarPanelforHouseholdElectricityLoads",8thInternationalConferenceonInformationTechnologyComputerandElectricalEngineering(ICITACEE),Semarang,2021,doi:10.1109/ICITACEE53184.2021.9617551




DOI: https://doi.org/10.35970/infotekmesin.v13i1.962

Article metrics

Abstract view : 0 times
PDF - 0 times

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.

Indexed by:

 
   

 

Editorial Office:

Pusat Penelitian dan Pengabdian Masyarakat (P3M)
Politeknik Negeri Cilacap
Jln. Dokter Soetomo No.1, Karangcengis Sidakaya Cilacap
Jawa Tengah 53212
Telepon: (0282) 533329
Email: infotekmesin.ejournal@pnc.ac.id

 

   Flag Counter

 

View My Stats

 

Creative Commons License
INFOTEKMESIN is licensed under a Creative Commons Attribution 4.0 International License.