Studi Kelaikan Tower BTS Berdasarkan Sudut Kemiringan, Kekencangan Baut, Kekuatan Beton Serta Pengukuran Ground

  • Vicky Prasetia Politeknik Negeri Cilacap
  • Arif Sumardiono Politeknik Negeri Cilacap
  • Sugeng Dwi Riyanto Politeknik Negeri Cilacap
  • Muhamad Yusuf Politeknik Negeri Cilacap
Abstract views: 24 , PDF downloads: 27
Keywords: network tower, vertically, grounding

Abstract

Telecommunication Network Tower is a tower made of a series of iron profiles or rectangular or rectangular pipes, or rectangular long pipes intended to accommodate antennas and radio transmitters and receivers of telecommunications and information waves. In principle, BTS towers have the function of connecting network user communication devices to other networks. To support the smooth operation of the network, the building will remain solid and secure for a certain period. Investigation of the feasibility condition of the tower structure is very important to determine the overall condition of the tower structure. The methods used are hammer test, check bolt tightness (torque), measure slope (vertical), grounding, and visual observation. From the results of the test data obtained the average bolt tightness is 432.86 Nm. The tower slope test of 1.90 cm on leg A smaller than 3.6 cm is considered good because it is still within the tolerance limit of the bat slope, the average soil resistance measure smaller than1 ohm used is very good, and the visual physical conditions are very similar, so it can be done Tower in safe and working condition

References

R. A. Saputra, L. S. Ramdhani, and M. Firmansyah, “PENERAPAN METODE TOPSIS PADA SISTEM PENUNJANG KEPUTUSAN REKOMENDASI MENARA TELEKOMUNIKASI,” CESS (Journal of Computer Engineering System and Science), vol. 4, no. 2, pp. 137–143, 2019.

N. Ismail, Maharoni, and I. Lindra, “Analisis Perencanaan Pembangunan BTS (Base Transceiver Station) Berdasarkan Faktor Kelengkungan Bumi Dan Daerah Fresnel Di Regional Project Sumatera Bagian Selatan,” JURNAL ISTEK - UIN Sunan Gunung Djati, vol. IX, no. 1, pp. 104–121, 2015.

R. M. Simatupang, D. Nuralinah, and C. Remayanti, “Korelasi Nilai Kuat Tekan Beton Antara Hammer Test, Ultrasonic Pulse Velocity (UPV) Dan Compression Test,” Jurnal Rekayasa Sipil, vol. 10, no. 1, pp. 26–32, 2016.

F. Dewantoro and A. Widodo, “KAJIAN PENCAHAYAAN DAN PENGHAWAAN ALAMI DESAIN HOTEL RESORT KOTA BATU PADA IKLIM TROPIS,” Journal of Infrastructure in Civil Engineering (JICE), vol. 02, no. 01, pp. 1–7, 2021, [Online]. Available: https://ejurnal.teknokrat.ac.id/index.php/jice

A. Phelia, D. E. Damanhuri, K. Kunci, A. Manfaat-Biaya, B. Lampung, and T. Skenario, “KAJIAN EVALUASI TPA DAN ANALISIS BIAYA MANFAAT SISTEM PENGELOLAAN SAMPAH DI TPA (STUDI KASUS TPA BAKUNG KOTA BANDAR LAMPUNG) EVALUATION of LANDFILL AND COST BENEFIT ANALYSIS WASTE MANAGEMENT SYSTEM LANDFILL (CASE STUDY TPA BAKUNG CITY BANDAR LAMPUNG),” 2019.

B. M. Susanto, E. S. J. Atmadji, and W. L. Brenkman, “IMPLEMENTASI MQTT PROTOCOL PADA SMART HOME SECURITY BERBASIS WEB,” Jurnal Informatika Polinema, vol. 4, no. 3, 2018, doi: 10.33795/jip.v4i3.207.

A. A. Aldino and F. Lestari, “Pemilihan Moda Dan Preferensi Angkutan Umum Khusus Perempuan Di Kota Bandar Lampung,” JURNAL TEKNIK SIPIL : RANCANG BANGUN, vol. 6, no. 2, pp. 29–34, 2020, [Online]. Available: http://ejournal.um-sorong.ac.id/index.php/rancangbangun

A. E. Yeheskiel Sembiring Steenie Wallah and B. M. M Ointu, “PENGARUH PEMBEBANAN TERHADAP HASIL PENGUJIAN HAMMER TEST PADA KOLOM BETON BERTULANG,” Jurnal Sipil Statik, vol. 7, no. 2, pp. 277–284, 2019.

D. Eka Putra and F. Angga, “STUDI SISTEM PENTANAHAN SALURAN UDARA TEGANGAN TINGGI (SUTT) PENGHANTAR 150 KV LUBUK LINGGAU - EKALONGAN PT. PLN (PERSERO) UNIT PEMBANGKIT DAN TRAMSISI (UPT) BENGKULU,” Jurnal Surya Energy, vol. 3, no. 1, pp. 220–227, 2018.

J. Arifin, “Pengukuran Nilai Grounding Terbaik Pada Kondisi Tanah Berbeda,” Jurnal ELTIKOM, vol. 5, no. 1, pp. 40–47, Mar. 2021, doi: 10.31961/eltikom.v5i1.251.

R. P. Luntungan, L. S. Patras, and G. MCh Mangindaan, “Analisa Daerah Lindung dan Grounding Pada Tower Transmisi Akibat Terjadinya Back Flashover,” Journal Teknik Elektro dan Komputer, vol. 7, no. 3, pp. 199–206, 2018.

Z. Puslitbangtek Ketenagalistrikan, E. Baru, T. dan Konservasi Energi Jl Cileduk Raya Kav, K. Lama, and J. Selatan, “DESAIN DAN ANALISIS STRUKTUR MENARA LATTICE PEMBANGKIT LISTRIK TENAGA ANGIN 100 Kw DI DESA TAMANJAYA, SUKABUMI, JAWA BARAT DESIGN AND STRUCTURE ANALYSIS OF 100 kW WIND TURBINE LATTICE TOWER IN TAMANJAYA VILLAGE, SUKABUMI, WEST JAVA,” 2016.

A. Rosyid Idris, W. P. Alfira, I. Razak, and W. Suyono, “ANALISIS PENGARUH PEMASANGAN COUNTERPOISE DAN DIRECT GROUNDING PADA TOWER TRANSMISI SALURAN UDARA TEGANGAN TINGGI 70 KV LINE MANDAI-PANGKEP,” Seminar Nasional Hasil Penelitian dan Pengabdian Kepada Masyarakat (SNP2M) Politeknik Negeri Ujung Pandang, vol. 109, pp. 109–114, 2021.

A. AR, Sofyan, and M. Ulil Abshar, “Analisis Resistansi Pentanahan Pada Menara Transmisi 150 kV Jalur Maros-Sungguminasa,” Prosiding Seminar Nasional Teknik Elektro dan Informatika (SNTEI), pp. 53–59, 2020.

H. Hasanah, “TEKNIK-TEKNIK OBSERVASI (Sebuah Alternatif Metode Pengumpulan Data Kualitatif Ilmu-ilmu Sosial),” Jurnal at-Taqaddum, vol. 8, no. 1, pp. 22–46, 2016.

PlumX Metrics

Published
2024-01-27